Family Owned·Veteran Owned·Made in USA
Automated packaging equipment line moving a carton on a conveyor
Industry

Machine & Equipment Builders

Description

New Tech Metals delivers precision manufacturing solutions for OEMs in the machine and equipment sector. We produce high-quality components and assemblies for complex machinery, built to customer drawings and technical specifications. Our capabilities span diverse sizes, materials, and complexities, supporting accelerated equipment launches while ensuring consistent quality, repeatability, and on-time delivery for ongoing production.

Proven Programs

  • Paper Converting, Packaging & Printing Equipment ComponentsSince 2000

Common Applications

  • Paper Converting
  • Packaging Equipment
  • Drying & Curing Systems
  • Commercial Appliance
  • Power Equipment
  • Material Handling

Certifications for Machine & Equipment Builders

  • ISO 9001:2015
  • AS9100D
// Equipment Programs

Where NTM fits in the machinery supply chain.

  • Program · 01

    Paper Converting

    Structural frames, guards, and sheet-metal sub-assemblies for paper converting equipment. Carbon and stainless fabrication for roll-handling and web-line components.

    D1.1D1.3D1.6
  • Program · 02

    Packaging Equipment

    Frames, panels, guards, and enclosures for packaging machinery. Sheet metal and stainless weldments for food-contact and washdown environments.

    D1.1D1.3D1.6
  • Program · 03

    Drying & Curing Systems

    Sheet-metal enclosures, housings, ductwork, and structural frames for industrial drying and curing equipment. Carbon and stainless fabrication.

    D1.1D1.3D9.1
  • Program · 04

    Commercial Appliance

    Stainless and carbon sheet-metal sub-assemblies, enclosures, and panels for commercial appliance manufacturers. Food-grade stainless when specified.

    D1.3D1.6D9.1
  • Program · 05

    Power Equipment

    Structural weldments, frames, brackets, guards, and housings for power equipment programs. Mild steel, high-strength steel, and T1 fabrication.

    D1.1D1.2D1.3
  • Program · 06

    Material Handling

    Structural frames, conveyor sub-assemblies, hoppers, chutes, and sheet-metal guards for material handling equipment. Carbon and aluminum fabrication.

    D1.1D1.2D1.3
// Machine & Equipment Programs
Machine & equipment work
Machine & equipment work
Machine & equipment work
Machine & equipment work
Machine & equipment work
Machine & equipment work
Machine & equipment work
Machine & equipment work
Machine & equipment work
Machine & equipment work
Machine & equipment work
Machine & equipment work
Machine & equipment work
Machine & equipment work
Machine & equipment work
// Quality & Standards Stack

Flowdowns equipment OEMs send to suppliers.

  • ISO 9001:2015ISO · NTM Certified

    Quality Management Systems: Requirements

    International quality management baseline. NTM is ISO 9001:2015 certified, the underlying QMS that supports document control, traceability, and corrective-action processes M&E OEMs expect from their fabrication suppliers.

  • AS9100DSAE / IAQG · NTM Certified

    Quality Management Systems: Aerospace, Defense, and Equipment

    Aerospace and defense quality management standard with applicability into M&E programs that require AS9100-grade flowdowns. NTM holds AS9100D, which adds risk management, configuration management, and first-article requirements on top of the ISO 9001:2015 baseline.

  • AWS CodesAmerican Welding Society

    D1.1 Structural · D1.3 Sheet Steel · D9.1 Sheet Metal

    Structural-steel, sheet-steel, and light-gauge welding codes most often flowed to M&E fabricators. NTM's welders are qualified across nine AWS codes spanning steel, aluminum, stainless, sheet metal, resistance spot, and welding-symbol standards.

  • PPAPAIAG · IATF 16949 (5 levels)

    Production Part Approval Process

    New-part submission process that automotive and industrial M&E OEMs flow down to suppliers. Level 3 is the common baseline: dimensional study, material certs, performance test data, capability data. NTM produces the underlying documentation Tier-1 customers compile into their PPAP submissions.

  • UL / NSFUL Solutions · NSF International

    Underwriters Laboratories · NSF International

    Industry-standard third-party listings commercial appliance, power equipment, and food-contact M&E OEMs flow down to their finished-equipment programs. Component fabricators support these listings through documented material certifications and process records, not by holding the listing themselves.

// From Spec to Ship

How equipment parts move through our floor.

  1. 01

    Drawing & BOM Review

    Customer drawings, BOMs, and technical specifications reviewed for manufacturability before quoting and release.

  2. 02

    Material Procurement w/ MTRs

    Material sourced with Mill Test Reports: heat lot, alloy, mechanical properties verified at receiving.

  3. 03

    Cut

    Sheet, plate, and structural shapes cut to print on laser, turret punch, or shear. Nested for material yield.

  4. 04

    Form

    CNC press brake forming for panels, brackets, enclosures, and structural members per drawing tolerances.

  5. 05

    Weld

    Multi-process welding by AWS-certified welders: MIG, TIG, spray-arc, flux core, or robotic per print requirements.

  6. 06

    Machine + Hardware Install

    CNC milling, drilling, and tapping for precision features. Pemsertion / rev nut hardware installed on the Haeger 824 w/ Autofeed.

  7. 07

    Finish

    Timesavers belt graining, deburring, tumbling, and sandblasting prior to coating or assembly.

  8. 08

    FAI + C of C → Ship

    First Article Inspection completed when required; Certificate of Conformance compiled with documentation package before ship.

// Common Questions

What equipment buyers ask about NTM.

  • FAQ · 01 / 06

    What production volumes does NTM handle?

    NTM supports low- to high-volume production runs; the right fit depends on part complexity, material, and current capacity. Volume targets, release cadence, and forecast windows are confirmed in the RFQ so we can stage capacity against your launch and ongoing production schedule.

  • FAQ · 02 / 06

    What's NTM's typical first-article lead time for new M&E components?

    First-article lead time depends on part complexity, material availability, the operations the component requires (cut / form / weld / machine / finish), and current floor capacity. Specific timing is confirmed in the quote alongside the FAI documentation scope.

  • FAQ · 03 / 06

    Does NTM work with packaging equipment OEMs?

    Yes. Packaging Equipment is one of the six Common Applications NTM publishes under its Machine & Equipment Builders industry. We fabricate frames, panels, guards, and enclosures for packaging machinery, including stainless weldments for food-contact and washdown environments where called for.

  • FAQ · 04 / 06

    Does NTM fabricate components for commercial appliance manufacturers?

    Yes. Commercial Appliance is one of the six Common Applications NTM publishes under Machine & Equipment Builders. We produce stainless and carbon sheet-metal sub-assemblies, enclosures, and panels, including food-grade stainless work when the spec calls for it.

  • FAQ · 05 / 06

    Can NTM scale from prototype to production runs?

    Yes. NTM's Development service is built around exactly that hand-off: design for manufacturability and prototype capabilities so customers can test and validate before full-scale manufacturing, then transition the same part into ongoing production on the same equipment list. The brief specifically calls out supporting accelerated equipment launches and ongoing production.

  • FAQ · 06 / 06

    What materials does NTM work with for M&E components?

    NTM's published M&E material range covers mild steel, high-strength steel, T1 steel, stainless steel, aluminum, and food-grade stainless. Welders are AWS-qualified across the corresponding codes so the welding scope matches what the print and the application require.

// Quality Control

Equipment Quality Standards.

M&E OEMs require documentation that supports their own quality management systems. NTM produces the underlying inspection records and material certifications that downstream Tier-1 and OEM quality teams compile into their compliance packages.

See full quality system →
  • Multi-Process Welder Qualification

    Welders qualified across MIG, TIG, spray-arc, flux core, resistance projection, and robotic processes, matched to print requirements per weld symbol.

  • CMM Dimensional Verification

    Coordinate Measuring Machine variable-data measurement for first-article qualification and ongoing capability studies on machined and formed features.

  • First Article Inspection

    Documented FAI completed when required by M&E OEM contract, with dimensional, material, and welder qualification records compiled into a single submittal package.

  • Material Traceability (MTR)

    Mill Test Reports and heat lot identification carried from receiving inspection through finished shipment so material conformance traces back to the certified source.

  • Documentation Packages

    Dimensional study, material certifications, and capability data compiled in the format M&E Tier-1 and OEM quality teams need for PPAP, AS9100, or customer-specific submissions.

  • Certificate of Conformance

    C of C available per shipment referencing applicable flowdown clauses: AWS codes, AS9100D, ISO 9001:2015, and customer-specific requirements where called out on the PO.

Veteran-Owned · Made in USA

Let's Build Together

NEW Tech Metals is a veteran-owned, family-owned small business supplying precision metal components and finished products to OEMs and Prime Contractors nationwide, supporting Defense, Transportation, and Machine & Equipment Building programs.